Sunday 20 January 2013

Slow progress...

There's no photos for today's post, since I can't seem to find the camera... :(

We made slow progress on Saturday. Thnkfully the plumber came out in the morning to finish the hot water which is good. All the base cupboards were attached to the wall, one benchtop was put on and the sink was put in to the bench. Hopefully today we can get all the cabinets and bench tops finished. After that the plumber needs to come in on Monday to connect the dishwasher, install the tap and install the waste pipe for the sink. Since the hot water was reconnected we have lost a lot of water pressure (hot and cold) in the bathroom so we also need him to check that.

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...